Finch West Station on the Finch West LRT

CSI was contracted for the installation of mass structural shotcrete station walls at the Finch West Station project. CSI placed over 1750m3 of low heat of hydration shotcrete for walls up to 56” thick in the station entrances and station box.

Alana Hennessy

Alana Hennessy { Freelance Graphic & Web Designer }

http://www.alanahennessy.com
Previous
Previous

Dufferin Transfer Station Building 300

Next
Next

Simcoe PATH Tunnel